Case Study: DLE Engineering Ltd

We talked to Dave Ludgate of DL Electrical Engineering about how he’s used Weintek HMIs with the Productivity PLC range. Dave, tell us a bit about yourself…I left school at 16 and went straight into an electrical apprenticeship and progressed from there. I’ve always been interested in new stuff, so the minute I saw PLCs I was hooked.  The beauty of the PLCs is that you wire the inputs and outputs and the magic all happens inside. I went back to college and took City & Guilds for electronics and never looked back. I lectured at Northampton College for a year Continue reading Case Study: DLE Engineering Ltd

Case Study: Board24 – Remote Monitoring & Control with CCTV and Fire Alarm Integration

We needed to find a way for the engineers on the Baler to see if the fans were running and to stop them remotely.  We also wanted to be able to see the status of the Baler from the fan end of the system without running over to check. Board24 is an FSC Certified manufacturer of recyclable corrugated sheetboard. They set high standards in terms of our product quality and environmentally friendly approach. They produce corrugated board which is 100% recyclable, 100% biodegradable and made from 90% recycled or recovered paper. We talked to Mark Crawford, Electronics Project Manager, about Continue reading Case Study: Board24 – Remote Monitoring & Control with CCTV and Fire Alarm Integration